mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

answer please ir Need help
Write one number that is a factor of 13
Which line from "She Walks in Beauty" describes the woman in an unusual way?
Which piece of information about Doris Lessing would more likely be found in the New York Times article “Doris Lessing Wins Nobel Prize in Literature” than in
the first factor in determining how advertisement should be designed
Match the effects on the concentration of SO3 gas when the following changes occur after initial equilibrium has been established in this system (N.C. = no chan
How would you solve the following geometry problem?: ∆PQR, find the measure of ∡P. In Triangle PQR where angle Q is a right angle. QR measures 33 point 8; PQ m
In which place can you see un oso? (1 point) A en el museo B en el zoologico C en el monumento D en el mar
1. Mes grands-parents habitent à la campagne en Normandie. Au printemps pendant les vacances je vais avec mon frère Jean et ma soeur Lou chez mes grands-parents
Which answer is correct?