5 men take 45hours to build a wall.how long will it take 9men working at the same wall?​

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

25 hours

Step-by-step explanation:

It takes 5 men 45 hours to build a wall.

So, if no. of men increases by 1.8 [∴ 5 x 1.8 = 9],

then time taken reduces by that same amount.

=> 45 hours / 1.8

=> 45 / (9/5)

=> 45 x 5 / 9

=> 5 x 5

=> 25 hours

Answer Link

Otras preguntas

kerjasama kebersihan di sekolah
What is highest estimate for the total number of muslims that live in the world today?
What’s the answer plzzzz help me!!!
if you vertically compress the absolute value parent function f(x)=|x| by a factor of 3 what is the equation of the new function
You apply a potential difference of 5.70 v between the ends of a wire that is 2.90 m in length and 0.654 mm in radius. the resulting current through the wire is
What surprised the British at Bunker Hill?
In Ewe ensembles, the gankogui and axatse function as A. melodic instruments. B. timekeepers. C. the controlling instruments of the ensemble. D. improvis
A sinusoidal wave travels with speed 250 m/s . its wavelength is 3.5 m . part a what is its frequency
Is it ever appropriate for a diplomat to express disagreement with his or her country’s leader?
David is preparing a report to show the percentage increase in population in the United States in The Last 5 Years which feature of a word processing program sh