hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

For the parallelogran, find the value of the variables. Show your work
If the side lengths of triangle ABC have the ratio 2 : 3 :4 and the perimeter is 108 calculate each side length for triangle ABC
how are quotes and voluntary export restraints similar?
3. Why is World War I remembered as a total war? (4 points) Every nation on the globe was involved in the conflict. Its battles caused civilian casualties a
After taking the ___ students receive access to the ORA Personality ProfilerA) PSATB) ACTC) AspireD) ORA
8th out of 10 questions 2
The sum of two numbers is 56, and their difference is 10. What are the numbers? A. 33 and 23 B. 30 and 26 C. 20 and 36 D. 20 and 30
Solve each word problem using a system of equations. Show work please! #59 and #60.
Which type of protein makes up blood tissue?
Can someone help me out please.