maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

nane two areas of europe that stayed under muslim control
Olga worked 37.5 hours last week at the library and earned 12.50 an hour.if she gets a 2.50 per hour raise,how many hours will she have to work to make the same
Give an example of how energy can be transferred from a baby to a mother.
What function is represented by the graph?
Millie works 8 hours on Saturday and earns £6.50 an hour. Her bus fare to work costs £2.75 and she also spends £4.25 on her lunch. She allocates an equal amo
What is 77 divided by5443 because I need help
Write and solve an equation for : The difference between 1257 and 973 divided by 2
A box contains plain 3pencils9 and pens. A second box contains color7 pencils and 3 crayons. One item from each box is chosen at random. What is the prob
Jacob is standing 112 m from a building. The angle of elevation from where he is standing on the ground to the top of the building is 62°.How tall is the buildi
Read the passage from "The Tell-Tail Heart": How, then, am I mad? Hearken! and observe how healthily--how calmly I can tell you the whole story. What is the co