if 25 worker need 3 days to build a house how long will 10 worker need

Respuesta :

sasukezwrldzxu
sasukezwrldzxu sasukezwrldzxu
  • 04-03-2021

Answer:

3 x 10 = 30 man-days per house

Answer Link
akbusiness987
akbusiness987 akbusiness987
  • 04-03-2021

Answer:

7.5 days

Step-by-step explanation:

Answer Link

Otras preguntas

what is the only non metal in group 14
A 16-mile race is made up of 3 equal sections. Which equation shows how to find the number of miles in each section?
how is the membrane surface area increased within cells and organelles
is 0.221 between 0.2 and 0.225?
why did foreign powers treat the vs goverment under the rticles of confederation with scorn
Which medium is the greatest threat to the printed newspaper? a. Internet b. television c. radio d. e-mail
A substance that accelerates the rate of a chemical reaction is called a(an) a. catalyst. b. lipid. c. molecule. d. element.
How to factor 54a +24b
Earth’s magnetism is related to the circulation of molten material within Earth’s core.
an object with a mass of 6 kilograms accelerates 4.0 MS to the second when an unknown force is applied to it what is the amount of force