raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

Please answer this question now
Which revision of the first sentence best incorporates the literary term mood? Rainsford is not in the mood to listen to Whitney’s irrational assumptions about
Those shopping bags look really heavy. ? carry one for you. That's very kind of you. A. Will I B. Can I C. Do I D. Shall I
3x = 6+y - 3х + y = -6
A paint mixer calls for 3 parts of white paint to 8 parts of red paint to make pink. How many parts of red paint would you mix with 12 parts of white paint to g
Determine the quadrant(s) in which (x,y) is located so that the condition(s) is/are satisfied (x, -y) is in the second quadrant.
which of the following is the solution to the inequalitY below. (-5x-10 <20)A.x > -6B. x > -2C. x < -6D. x < -2
A national survey of companies included a question that asked whether the company had at least one bilingual telephone operator. The sample results of 90 compan
How would 0.09 be represented as a percent? A. 0.9% B. 9% C. 90% D. 0.0009%
Find the smallest number by which 8788 must be multiplied so that the quotient is a perfect cube. Also, find the cube root of the perfect cube so obtained.​