Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

Ethnic identity is based upon _____ groups, while racial identity is based upon _____ groups.
During a rain shower the road surface is likely to be most slippery when
I NEED SOME HELP PLZ I need a introduction paragraph or i a few ideas to start my essay!!
The rectangle shown below will undergo a single reflection through a line L. If the result of the reflection is a rectangle in the same position, which of the f
Which events brought unity to europe and which events brought disruption?
The length of a copper wire is 1.6 centimeters (cm). What is the length of this wire in meters (m)? 1.6 mc031-1.jpg 10–3 m 1.6 mc031-2.jpg 10–2 m 1.6 mc031-3.jp
Determine the number of possible triangles, ABC, that can be formed given B = 45°, b = 4, and c = 5. Answers: 0 1 2 and please help explain if possible thanks
What did booker t. washington and w. e. b. dubois agree on?
Determine the grams of oxygen gas that reacts with 1.75 moles of hydrogen gas
2 (-4x + 3) - 7x = 6x -7