what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

what operating system is an open source program
Only two forces act on an object (mass = 3.80 kg), as in the drawing. (F = 51.0 N.) Find the magnitude and direction (relative to the x axis) of the acceleratio
"Which statement is necessarily true if BD is an altitude to the hypotenuse of right ΔABC? A.) ΔADB≅ΔBDC B.) ΔADB~ΔBDC C.) ABBC=ACBD D.) ∠BAC≅∠BDC"
the virginia declaration of rights was written by
8 = 3(3x + 8) − x whats x and explenation :)
one circle has a circumference of 12 pi . another circle has a circumference of 32 pi . what is the ratio of the radius of the smaller circle to the radius of t
what contributed to the events of bleeding kansas
A basket contains four apples three peaches and four pears . you randamoly eat three pieces of fruit . the first one you want is a apple second two you eat a
Which of these strategies ensures soil quality for the next growing season? digging irrigation canals using crop rotation enclosing animals in fences findin
what are some non examples of density